GIVE US A CALL 800-265-3348

CAMERON HOME CONSTRUCTION

Home construction site in Amaranth. We have completed everything from the entrance, driveway, excavations for the home and barn as well as hydro trenching and septic design and installation.
LEARN MORE

CLARKE WATERLOO BIOFILTER SEPTIC

Tertiary treatment septic system installation for a client in Caledon. On this site space was extremely limited with tight boundaries and multiple authorities to work with to get the approvals for the system.
LEARN MORE

WILFRED COTTAGE DEMOLITION

Cottage demolition on Belwood Lake. This structure was well past the point of saving and our client wanted to start fresh. Step one was to clear the site in preparation for the new build.
LEARN MORE

WEST TRANS TRUCK YARD

The West Trans truck yard and storage depot built for over 200 semi trailers. On this site we completed all aspects of the project from initial earth works to final grading.
LEARN MORE

SPRUYT AVE ROAD RECONSTRUCTION

Spruyt Ave reconstruction project. On this site we removed and rebuilt the road as well as installing new storm pipe with connections to the weepers of each home along Spruyt Ave to manage ground water issues.
LEARN MORE

BLUEBIRD SELF STORAGE

Bluebird Self Storage just east of Orangeville in Mono. On this site we started from bare earth and completed all site works. What an absolutely top notch project with an incredible finished product.
LEARN MORE

RIVER BANK STABILIZATION

River bank stabilization project to help protect a beautiful Mono cottage. Decades of erosion had left this cottage dangerously close to what can be a fast flowing River.
LEARN MORE

HOFFMAN PLASTICS

Hoffman Plastics building expansion in Orangeville. On this site we moved 10,000 cubic metres of earth to allow for a new 50,000 square foot addition including sewer and water, storm, asphalt and finished grading.
LEARN MORE
CONTACT
ALLTO CONSTRUCTION
for your free estimate and consultation.
800-265-3348

SERVING SOUTH CENTRAL ONTARIO
SINCE 1969.