CAMERON HOME CONSTRUCTION
Home construction site in Amaranth. We have completed everything from the entrance, driveway, excavations for the home and barn as well as hydro trenching and septic design and installation.
LEARN MORE
CLARKE WATERLOO BIOFILTER SEPTIC
Tertiary treatment septic system installation for a client in Caledon. On this site space was extremely limited with tight boundaries and multiple authorities to work with to get the approvals for the system.
LEARN MORE
WILFRED COTTAGE DEMOLITION
Cottage demolition on Belwood Lake. This structure was well past the point of saving and our client wanted to start fresh. Step one was to clear the site in preparation for the new build.
LEARN MORE
WEST TRANS TRUCK YARD
The West Trans truck yard and storage depot built for over 200 semi trailers. On this site we completed all aspects of the project from initial earth works to final grading.
LEARN MORE
SPRUYT AVE ROAD RECONSTRUCTION
Spruyt Ave reconstruction project. On this site we removed and rebuilt the road as well as installing new storm pipe with connections to the weepers of each home along Spruyt Ave to manage ground water issues.
LEARN MORE
BLUEBIRD SELF STORAGE
Bluebird Self Storage just east of Orangeville in Mono. On this site we started from bare earth and completed all site works. What an absolutely top notch project with an incredible finished product.
LEARN MORE
RIVER BANK STABILIZATION
River bank stabilization project to help protect a beautiful Mono cottage. Decades of erosion had left this cottage dangerously close to what can be a fast flowing River.
LEARN MORE
HOFFMAN PLASTICS
Hoffman Plastics building expansion in Orangeville. On this site we moved 10,000 cubic metres of earth to allow for a new 50,000 square foot addition including sewer and water, storm, asphalt and finished grading.
LEARN MORE
SERVING SOUTH CENTRAL ONTARIO
SINCE 1969.
SINCE 1969.