VIEW ALL PROJECTS
Limited space on this Caledon property required a septic solution capable of providing a high level of treatment within a relatively compact footprint.
Allto Construction selected and installed a Waterloo Biofilter tertiary treatment system to provide high-quality treated effluent before dispersal to the leaching bed.
Proper septic design is about more than simply meeting today's requirements. System sizing, treatment quality, installation practices and future maintenance can all affect the useful life and performance of the system.
The finished installation provides the homeowner with an advanced treatment solution that integrates cleanly into the surrounding property while being designed for reliable long-term performance.
Project Images
SERVING SOUTH CENTRAL ONTARIO
SINCE 1969.
SINCE 1969.